Skip to content

Projects

Work providers on this platform have already carried out.

1,544 projects

Marota City infrastructure project

Marota City infrastructure project

A comprehensive infrastructure development and implementation project in Marota City, covering road networks, water supply, wastewater and stormwater drainage, electricity, telecommunications, domestic gas, and related infrastructure services. Role & Responsibilities: Served as Project Manager and Head of the Supervision Team, responsible for managing and overseeing construction supervision activities, coordinating with relevant authorities and stakeholders, monitoring project progress and quality of execution, ensuring compliance with approved drawings and technical specifications, addressing technical and construction challenges, and following up on the works to meet project requirements.

Carried out: Aug 28, 2016

Rehabilitation of the Straight Street in Old Damascus

Rehabilitation of the Straight Street in Old Damascus

Project Description: One of the most prominent projects for the rehabilitation of historical axes in Old Damascus, extending from Bab al-Jabiya in the west to Bab Sharqi in the east with a length of approximately 1,900 meters. The project included the rehabilitation and paving of the street and sidewalks, treating the facades and properties of the overlooking buildings, and highlighting the archaeological elements within the site. Role: Head of the Supervision Team (Resident Engineer) Responsible for the technical supervision of the project works, coordinating and following up on tasks and relevant stakeholders, and monitoring implementation quality and its compliance with project requirements while preserving the historical and architectural character of the street.

Carried out: May 12, 2008

Massar Rose – Children’s Discovery Centre Project

Massar Rose – Children’s Discovery Centre Project

The Massar Rose Project in Damascus is a distinctive project combining innovative architectural design with complex multidisciplinary structural and technical requirements. During one of the project phases, I served as the Project Management Unit (PMU) Manager, overseeing and coordinating project activities, coordinating among the relevant stakeholders and parties, monitoring project progress, and addressing technical and administrative challenges to support the achievement of the project’s objectives.

Carried out: Jul 15, 2007

Restoration and Rehabilitation of a Traditional Damascene Hall

Restoration and Rehabilitation of a Traditional Damascene Hall

A project involving the restoration and rehabilitation of a traditional Damascene hall. The work included treating damaged sections, restoring traditional architectural and decorative elements, and rehabilitating the interior components while preserving the hall’s authentic Damascene character and heritage identity. The project also included improvements to the hall’s structural and functional condition to ensure safety and continued use while preserving its architectural and historical value.

Carried out: Dec 29, 2023

Restoration and Rehabilitation of a Traditional Damascene House

Restoration and Rehabilitation of a Traditional Damascene House

A project involving the restoration and rehabilitation of a traditional Damascene house. The work included assessing the building’s condition, treating damaged and deteriorated sections, restoring traditional architectural elements, and rehabilitating interior components while preserving the house’s original character and heritage identity. The project also included improvements to the building’s structural and functional condition to ensure safety and continued use, while preserving its architectural and historical value.

Carried out: Dec 25, 2020

Partial Reconstruction of a Traditional Damascene House

Partial Reconstruction of a Traditional Damascene House

A project involving the partial reconstruction and rehabilitation of damaged sections of a traditional Damascene house. The work included the removal of collapsed sections and their reconstruction in accordance with the building’s structural system and traditional architectural details, while preserving its heritage identity and architectural integrity and ensuring the safety and durability of the reconstructed sections.

Carried out: Dec 22, 2025

Negative-Side Waterproofing of a Ground-Floor Shop

Negative-Side Waterproofing of a Ground-Floor Shop

The shop was suffering from water ingress from the adjacent property, resulting in severe deterioration of the paint and plaster layers, as well as significant mold growth, particularly inside the display cabinets. The deteriorated plaster was removed, and a layer of IS waterproofing paste, with a thickness of no more than 5 mm, was applied, effectively resolving the problem.

Carried out: Apr 7, 2007

Positive-Side Waterproofing of the Waterfalls at Al-Rayyan Restaurant

Positive-Side Waterproofing of the Waterfalls at Al-Rayyan Restaurant

The waterfalls at Al-Rayyan Restaurant were experiencing significant water leakage and substantial water loss, requiring daily refilling to maintain their operation. A layer of IS waterproofing paste, with a thickness of no more than 2–3 mm, was applied to the waterfalls, effectively resolving the leakage problem.

Carried out: Mar 25, 2006

Refrigeration Unit Installation

Refrigeration Unit Installation

A cold storage room was constructed in Aqraba area, measuring 15 × 10 meters, for the storage of Aleppo pistachios.

Carried out: Feb 8, 2007

Khan Al-Handasah Platform

Khan Al-Handasah Platform

Khan Al-Handasah is a directory and a showcase: engineers, companies, offices and suppliers publish what they actually offer, and anyone looking for a service, a product or an expert reaches them directly.

Carried out: Aug 1, 2026

Back to the directory