Palm Hotel and Resort
Syria
4,200 evacuated glass tubes, producing 10,000 liters of hot water daily, in addition to heating the water of 3 swimming pools.
Project details
- Location
- Syria
Published by: Altawfeer Renewable Energy
4,200 evacuated glass tubes, producing 10,000 liters of hot water daily, in addition to heating the water of 3 swimming pools.
Published by: Altawfeer Renewable Energy